And so there the train sat, waiting in the clear. The leaving signal remained red because the switch was against them. I like these ctc signals. Perhaps I was not sure about them "in the beginning" as they are a "little bit" different! Notice the signals are controlled and interlinked by mircowave radio. You can see the directional antenna on top of the pole beside the signal house. Perhaps there is more going on in this picture than someone might first think or see! All it takes to see these things is a little understanding, and a little bit of time spent to look and then to see! |
Date:
12/21/2009 |
Location:
Rockland, WI Map  |
Views:
210 |
Collection Of:

Steve J Rush |
|
Author: Steven Rush
|
 |
Picture Categories: RollingStock,Winter,Signal,Action |
This picture is part of album: Waiting for traffic to clear |